73m Mega Yacht – CPP Control System Upgrade & Switchboard Refurbishment

73m Mega Yacht – CPP Control System Upgrade & Switchboard Refurbishment

Vessel type: Luxury motor mega yacht
Length overall (LOA): 73 metres
Year built: 1994
Location: Palma de Mallorca
Scope: Complete upgrade of CPP controls, switchboard breakers, and bridge console integration

Project Overview

Yacht Electrical Services was contracted to carry out an extensive electrical upgrade on a 73-metre luxury motor yacht built in 1994. The works included the refurbishment and replacement of critical control systems, improving propulsion control, switchboard functionality, and overall bridge interface operations.

Services provided

Services Provided
  • Design and construction of a new STB CPP (Controllable Pitch Propeller) control cabinet:
    • Custom dimensions to fit the new location on board
    • Supply of all required electrical hardware
  • Refurbishment of the existing Port CPP control box:
    • Full internal hardware upgrade while maintaining the original enclosure
  • Replacement of EM (emergency) switchboard breakers for enhanced safety and reliability
  • Implementation of a new CPP control station on the bridge console, including:
    • Hardware supply and system integration
    • Electrical drawings for installation and classification compliance
    • Testing and full commissioning of the new controls
  • Replacement of the bow thruster breaker, ensuring uninterrupted performance during manoeuvring operations

Related work

45m Luxury Sailing Yacht – DEIF PMS, Tender Pole Control & Captive Winch Upgrade

56m Sailing Yacht – Navigation Lights, PLC Control & Tender Hatch System Upgrade

50.58m Sailing Yacht – DEIF PMS Installation and Generator Upgrade

Scroll to Top